STAGE 52

 Return to the BUILD


“In this assembly session you will attach the front left and front right floor panels to your model’s floor pan.”

 

Contents


Parts

Materials: All of these parts are plastic.

Build


Assembling the Floor

Stage 52.1

Retrieve your Floor Pan assembly from the previous stage. Fit the Front Left Floor Panel (marked ‘L’) to this front left location, as shown:

Secure this Front Left Floor Panel into place from below with two (2) CP screws:

Stage 52.2

In the same way, fit the Front Right Floor Panel (marked ‘R’) to this location to the other side, as shown:

Secure this Front Right Floor Panel into place from below with two (2) more CP screws:

Stage 52.3

Turn the Floor Pan assembly upside down and fit the Rear Floor Panel to the back, aligning the screw holes as shown:

Begin securing this Rear Floor Panel with two (2) HP screws in these holes:

Stage 52.4

Finish securing the Rear Floor Panel to the Floor Pan with four (4) more HP screws:

Thoughts


This was a quick stage, but we are slowly building up our Charger interior!

Next Up


 Stage 53 – Seat, Backrest, Seat Belt

Leave a Reply

Your email address will not be published. Required fields are marked *