In this final Stage 110 of the build, we add some chassis Struts, the radio Antenna, the hood rings, and a supercharger valve!
Category Archives: BUILD
Stage 109
We build and install the Front Right Wheel Arch with Stage 109!
Stage 108
The Front Left Wheel Arch is built and installed during Stage 108!
Stage 107
In Stage 107, we will be adding the Brackets to the Nose assembly we built long ago, and then attaching it to the Body!
Stage 106
This is going to be a big one. Not only is the beautiful Fuel Tank (fuel cell) is built and installed to the Boot Floor Panel, we will also be connecting the Body to the Chassis with Stage 106!
Stage 105
Work begins on the floor of the Boot (Trunk) as we complete Stage 105!
Stage 104
In Stage 104, we add both of the Rear Wheel Arches!
Stage 103
We install the Reverse Lights and attach the Rear Lower Panel to our Charger in Stage 103!
Stage 102
The Rear Bumper and license plate are attached to our Body with Stage 102!
Stage 101
The rear deck/trunk panels and some decorative hinges are installed during Stage 101!